Oakwood Previous Page    OAKWOOD CONSTRUCTION PHOTOGRAPHY    Oakwood Home Page

The Oakwood Residence
A Nature Sanctuary
Miami, FL
                       
Thao's Pagoda

Oakwood Project Index
Click on the item below
            item description
  1 Oakwood Project Information Site Info, Building Info, Consultants and Contractors
10 Oakwood Project Description  Project Description & Owner's Statement
  20 Oakwood Illustrations Floor Plans / Elevations / Misc
50 Oakwood Photo Station Map Photo Station Map

51 Oakwood Photo Station #01 Photo Station #01

52 Oakwood Photo Station #02 Photo Station #02

53 Oakwood Photo Station #03 Photo Station #03

54 Oakwood Photo Station #04 Photo Station #04

55 Oakwood Photo Station #05 Photo Station #05

56 Oakwood Photo Station #06 Photo Station #06

57 Oakwood Photo Station #07 Photo Station #07
58 Oakwood Photo Station #08 Photo Station #08

59 Oakwood Photo Station #09 Photo Station #09
60 Oakwood Photo Station #10 Photo Station #10

61 Oakwood Photo Station #11 Photo Station #11
100 Oakwood Demolition Photos January 2010

110 Oakwood Construction Photos February 2010 to June 2010
112 Oakwood Construction Photos July 2010 to December 2010
114 Oakwood Construction Photos January 2010 to March 2010
116 Oakwood Construction Photos April 2011 to June 2011
118 Oakwood Construction Photos June 2011 to August 2011
120 Oakwood Construction Photos August 2011 to October 2011
122 Oakwood Construction Photos October 2011 to December 2011
124 Oakwood Construction Photos December 2011 to December 2011
126Oakwood Construction PhotosJanuary 2012 to February 2012
128Oakwood Construction PhotosFebruary 2012 to February 2012
130Oakwood Construction PhotosFebruary 2012 to March 2012
132Oakwood Construction PhotosApril 2012 to July 2012
134Oakwood Construction PhotosJuly 2012 to August 2012
136Oakwood Construction PhotosAugust 2012 to October 2012
138Oakwood Construction PhotosOctober 2012 to November 2012
140Oakwood Construction PhotosNovember 2012 to December 2012
142Oakwood Construction PhotosDecember 2012 to January 2013
144Oakwood Construction PhotosJanuary 2013 to February 2013
146Oakwood Construction PhotosFebruary 2013
148Oakwood Construction PhotosMarch 2013 to September 2013
801 Topping Off Day June 14, 2011
901 Oakwood Miscellaneous Photos Miscellaneous Photos

904 Quan Yin Statue Photos Quan Yin Statue Photos

907 Chilin (Kirin) Statue Photos Chilin (Kirin) Statue Photos

Construction Photos  (continued)  
< Back to Previous Construction
Photos (118) from Jul 2011 to Aug 2011
 >>>   click on pics for enlargement (one at a time)   <<<
120
glass block being installed
above Living Rm
2879
glass block being installed
2880
2881
this picture gives a
hint of Peter's vision
for Oakwood... just a hint...
Accessory Building skylight
2882
Accessory Building louver
2883
Accessory Building
2884
Accessory Building
2885
a view from rooftop
looking East of the
opening for glass block
above Living Rm
2886
workers moving roof joists
into place
above Sun Rm
2887
a Geberit "in wall"
storage tank for
plumbing fixture
2888
a view of roof framing
and decking sub-surface
above Living Rm /
Sun Room
2889
another view (?) of roof framing
and decking sub-surface
above Living Rm /
Sun Rm

2890
another of many examples
of just how closely
the construction approaches
but does not disturb the incredible Live Oaks
2891
a view looking SW of the
hallway leading to MBR
and to the right will be
a most unusual Aquarium
2892
looking West through
the Master Bath.
In near left can be seen
the base of the Spa Shower
and to far right the Soak Tub
2893
a close-up of the framing
for a shelf adjacent
to the Soak Tub.
the exterior concrete slab
will be a shallow
reflecting pond
2894
along hallway,
framing for wall niche
2895
framing craftmanship at a concrete step
2896


a tube-steel beam that will support a display Shelf (#2)
(for statuary art)
above Living Rm
2897
looking up and NW from
Living Rm to high
glass block
Top of glass at 28 ft
above finished Floor (A.F.F.)
2898
in Mechanical Rm
electrical panels
being installed

2899
 >>>   click on pics for enlargement (one at a time)   <<<
looking up and NW from
Living Rm to high
glass block (completed)
Top of glass at 28 ft
above finished Floor (A.F.F.)

2900
wall sub-framing
being installed
above Living Rm
2901
the natural grade "floor"
of the Sun Rm
(aka "Conserviary"
or Conservatory / Aviary)
2902
looking through Studio SE
corner toward Covered Entry
2903
Roof over Sun Rm
Circular white elements
are forming for
SolaTube(tm) skylights
2904
concrete crew
pouring roof slab
over Living Rm / Sun Rm
2905
Soffit framing over Studio
with skylight shafts
2906
Is that Kevin
under that hat?
2907
NW walkway slab
just poured
2908


Looking West into Sun Rm
toward Kitchen Nook
2909
East face of building
at Eqpt Rm with newly completed glass block
2910
Virgil and crew
installing skylight framing
over Studio
2911

glass block on
NW wall of Studio
2912
in Sun Rm looking at
South wall
installing steel framing
for glass block wall 
2913
tube steel framing
(primed gray)
for Display Shelf #2
which will face East
toward Sun Rm
2914


looking toward entry Foyer
from Living Rm
tube steel (primed gray)
shall support
Display Shelf #1
2915
a view from exterior
just out side Master Bath
looking at new
curtain wall framing
2916
a view from outside
Master Vanity looing up to
NE at Equipment Rm....
wait till you see
what is going on top...
2917


s skylight shaft in Studio
2918
framing for bench
with three storage drawers along Media Rm West wall
2919
formwork for concrete
walkways between the
three buildings on site...
saving any and all trees
2920
a view of the statue guarding
the main entrance driveway
with Studio (right)
2921
low height partition
wall from Living Rm
toward Kitchen
2922
roll-down door being
installed in Studio
2923

interior view of Studio
roll-down door
2924
exterior view of Studio
roll-down door

2925
close-up of
Display Shelf #1
tube steel connection
to glass block frame
at Entry Foyer
2926
view from inside Studio
looking East.
metal ceiling framing
being installed
2927
view from inside Studio
looking NE through
roll-up door and glass block
 
2928
Peter paying close attention
to every detail
2929
 >>>   click on pics for enlargement (one at a time)   <<<
looking up to
the ceiling  over the
Living Rm / Sun Rm
2930
looking South along
East face of BR #2
2931
looking up to the
North soffit in Master BR
2932
the Master Vanity
getting wall framing
2933
looking South
from Master Bath.
The concrete deck will become  Reflecting Pond #2
2934
looking South to
sloped glazing
over Master Vanity
2935
Thumbs up !!!!
2936
looking North toward
Entry Foyer (r)
and Kitchen Nook (l)
2937
looking NW to the roof
deck over Master Bath.
Eqpt Rm #2 can be
seen to right
2938


looking along South faced
of Upper Loft & Mezzanine
2939
roof areas that will drain
West to glass waterfall
and a parapet wall just
under a large Live Oak
2940
another amazing Live Oak
trunk hugging the North
side of Living Rm
(over Kitchen below)
2941
looking at more incredible
Live Oaks bending
North over Studio
2942
this is the Live Oak trunk
that we spent most time
in design trying to make
the structure work in harmony. The trunk is 2 inches
above the super
reinforced parapet.
2943
within this space a
roll-down metal door
will be installed to protect
glass block wall below
2944

metal worker installing
horizontal framing for
South glass block wall
of Sun Room 
2945
looking at SE corner
of Master BR curtain
wall being installed
2946
a lot of mechnicals working
their way up to Eqpt Rm #2
2947
a Geberit in-wall plumbing storage tank frame
2948
looking up from exterior through Eastern face of
Sun Rm  (glass block will
fill this opening)
2949
Peter on cell
coordinating the project.
"Can you hold...,
It's my Architect on Line 2"
2950


over Studio one can see
the equipment stands
for A/C condensers
just past skylights
2951
East face of building.
(Just past the glass block is the Quan Yin statue)
2952
framing at the West side
of Media room for bench
with 3 drawers below
2953


plumbing work at
Master Vanity.
What a view and soon
to be  with hidden mirrors
2954
a path cleared for
a walkway along
South side of Sun Room.
One can see steel framing
for glass block wall
2955

a view looking in
through Foyer.
Front door will be at
near edge of glass block
2956


workers installing metal
framing for ceiling
over Living Rm
2957
concrete walkway
between buildings
2958
looking West through East facade of Sun Rm.
This opening will be
closed in with glass block
2959
 >>>   click on pics for enlargement (one at a time)   <<<
metal framing for
Display Shelf #1
over Foyer
2960
looking West
through Living Rm
Framing for Display Shelf #2
can be seen above
2961
metal frame for glass block
on South side of Sun Rm
2962


hallway from Living Rm
to Master BR.
2963
looking North from just
outside Master Bath
along Cistern
2964
where these two wall
bypass is the overflow
for the Cistern
2965


Along the North Face of 
Studio the steel framing 
will have a glass canopy
2966
formwork for walkway approaching Studio
and Covered Entry
2967
formwork for walkway
along North side
of Studio
2968
tube steel for Canopy at Bedroom #2 and Study as
well as formwork for steps
2969
Project Foreman Virgil
troweling walkway
2970
this pad along side
the freestanding Garage
will support a
whole house generator
2971

poured concrete
walkway along North
side of Studio

2972
the SE corner of the
Living Rm / Study area
(from exterior)
This area will have a glass staircase to Mezzanine
2973
poured concrete steps to
BR #2 (L) and Study (R)
with steel frame
for glass Canopy above
2974

a view up toward curtain
wall on South
side of Mezzanine
2975
another view toward
curtain wall on South
side of Mezzanine

2976
East face of curtain wall
at SE corner of mezzanine
Note sloped glazing at top
2977

interior view facing South of curtain wall at Mezzanine.
In this space the grand
staircase will be located
2978
the generator pad
poured and cured
2979
looking up to curtain
wall South face
at Mezzanine
2980


toward the lower left one
can see the "flying buttress" connecting to the South face.
The buttress is fully functional and soars up over high roof
2981
from roof over MBR
looking NE toward curtain
wall at Mezzanine / Loft.
The flying buttress column extends up through center
2982
curtain wall at South
face of Mezzanine
2983

view from Upper Loft
looking SE along
curtain wall
2984
view from Upper Loft
looking East along
curtain wall

2985
view from Sun Rm looking up toward  Mezzanine
and Upper Loft
2986

2011-10-05

 >>>   click on pics for enlargement (one at a time)   <<<
back to top
Construction Photos continued >   

pf_res_7201_120_constr_20130925