Using a special tool the glass installation crew prepares to move large panes of glass into place
3152 |
| Here is a picture of the speical tool attached to glass and being hoisted into position
3153 |
Glass being installed near south wall of Mezzanine
3154 |
|
| |
| |
| Looking NNW up through glazing over Master Vanity
3155 | | Looking SSW up through glazing over Master Vanity
3156 | Looking South along curtain wall glazing on West side of Master Bath
3157 |
| | | | |
| Looking up toward newly installed curtain wall glazing at corner near Sun Room and Mezzanine
3158 | | To the right are glass block panels on South wall of Sun Room. Ahead and up is curtain wall glazing near Sun Room and Mezzanine
3159 | Looking West through curtain wall to construction ladder up to Mezzanine
3160 |
|
| | |
|
| Curtain wall glazing installed at BR #2
3161 | | View near SW corner of Upper Loft from exterior roof deck
3162 | From the mid level roof deck, an idea of how many oak leaves gather on roof surface. We're thinking "compost" heap.
3163 |
| | | | |
| View from Upper Loft toward ESE where Sun Room meets Mezzanine
3164 | | View looking NE at South side of Mezzanine / Study / Sun Room
3165 | The ever present Live Oak trees hovering over and embracing the new structure.
3166 |
| | | | |
| At the Master Bedroom some interesting reflections in the glass. An incredible glass ceiling view will greet each new day.
3167 | | Another view from inside MBR
3168 | Glazing workers preparing a fixed glass window panel for installation
3169 |
| | | | |
| Glazing workers preparing a fixed glass window panel for installation
3170 | | From this angle, this may not look like much but this is a 10 ton Scholar Rock being unloaded from shipping container in Miami.
3171 | Here is a heavy duty fork lift pulling the Scholar Rock out of the shipping container
3172 |
| | | | |
| The Scholar Rock is 15' long and takes not one but two fork lifts to handle.
3173 | | Here one starts to get a feel for the magnificence of this ancient rock
3174 | Scholar Rocks are prized for four main qualities: thinness (shou) openness (tou) perforations (lou) and wrinkling (zhou)
3175 |
|
| |
| |
| A lot of care must be taken to move this rock from such a long distance (Vietnam) without damage
3176 | | The Scholar Rock is lowered to the ground after being removed from shipping container.
3177 | The framing for the front door is now in place
3178 |
| | | |
|
| Door framing in place at Living Room to West Patio
3179 | | A curious Turkey vulture stops by to inspect the Chilin statue guarding the residence
3180 | On roof deck at North side of Upper Loft and the soaring branches of the Live Oaks
3181
|
| | | | |
|
>>>