< Back to Previous Construction Photos (142)
|
|
>>>
click on pics for enlargement (one at a time) <<< |
| | 144 | |
| |
|
|
| Formwork for angular column in front of studio. This column will support a steel and glass canopy above
3389 | Another view of formwork for angular column in front of studio. 3390 | looking southwest toward roof over Master Bath 3391 |
| | | |
| parapet wall above Master Bath and over to right is the Equipment Room 3392 | Formwork and mesh for walkway / canopy leading to Main entry 3393 | Formwork and mesh for walkway / canopy adjacent to Studio 3394 |
|
| |
|
| Stucco bead applied to low ht wall at NE corner of Studio 3395 | Concrete being poured at angular column near Studio 3396 | Virgil leaning in to do some concrete finishing near Main Entry 3397 |
| |
| |
| Main Entry colonnade walkway just after concrete pour 3398 | Studio colonnade walkway just after concrete pour 3399 | Pocket doors at Mechanical Room in Studio 3400 |
| | | |
| Pocket doors at Mechanical Room in Studio 3401 | Pocket doors at Mechanical Room in Studio 3402 | Angular column in front of Studio after formwork removed (circular hole form yet to be removed) 3403 |
| | | |
| Angular column in front of Studio after formwork removed (circular hole form yet to be removed) 3404 | Looing north in hallway leading from Master Bedroom 3405 | looking up to column on North side of Mezzanine 3406 |
| | | |
| looking from inside Studio out to angular column 3407 | angular column in front of Studio 3408 | welders taking a break during construction of tube steel (and glass) canopy over Studio 3409 |
|
|
| |
| closer view of construction of tube steel (and glass) canopy over northern side of Studio 3410 | another view of construction of tube steel (and glass) canopy over northern side of Studio 3411 | one more view of construction of tube steel (and glass) canopy over northern side of Studio 3412 |
| | | |
| Tube steel frame being constructed over southern side of Studio 3413 | Tube steel frame being constructed over southern side of Studio 3414 | Welder carefully aligning tube steel beam along front facade of Studio 3415 |
|
|
| |
| Tube steel frame being constructed over southern side of Studio 3416 | A view from Study across Living room toward Breakfast Nook 3417 | Looking South toward Master BR with Master Vanity on right and WIC on left 3418 |
| | | |
| A view from western end of Living Room toward Kitchen 3419 | Tube steel (and glass) colonnade leading to Main Entry 3420 | Tube steel (and glass) colonnade leading to Main Entry 3421 |
|
| |
|
| Tube steel (and glass) colonnade leading to Main Entry 3422 | Angular column with oculus 3423 | Roof over Studio looking toward living Room... look at all those seemingly endless Live Oak leaves 3424 |
| | | |
| A view from roof looking southeast toward upper glass block above Living Room 3425 | Roof over Living Room looking toward three (3) window glass...and more live Oak leaves 3426 | On
mid high roof near Master BR looing North through dense Live Oak
branches.... and yes even more leaves....makes great organic compost
for a garden... just a suggestion Peter...just a suggestion.. 3427 |
| | | |
| | |
|
|
>>>
click on pics for enlargement (one at a time) <<< |
|
|
|
keep an eye here as
photos are updated weekly |
|
|
|
|
|
back to top |
| | | |
|
Construction Photos continued > |