Oakwood Previous Page    OAKWOOD CONSTRUCTION PHOTOGRAPHY    Oakwood Home Page

The Oakwood Residence
A Nature Sanctuary
Miami, FL
                       
Thao's Pagoda

Oakwood Project Index
Click on the item below
            item description
  1 Oakwood Project Information Site Info, Building Info, Consultants and Contractors
10 Oakwood Project Description  Project Description & Owner's Statement
  20 Oakwood Illustrations Floor Plans / Elevations / Misc
50 Oakwood Photo Station Map Photo Station Map

51 Oakwood Photo Station #01 Photo Station #01

52 Oakwood Photo Station #02 Photo Station #02

53 Oakwood Photo Station #03 Photo Station #03

54 Oakwood Photo Station #04 Photo Station #04

55 Oakwood Photo Station #05 Photo Station #05

56 Oakwood Photo Station #06 Photo Station #06

57 Oakwood Photo Station #07 Photo Station #07
58 Oakwood Photo Station #08 Photo Station #08

59 Oakwood Photo Station #09 Photo Station #09
60 Oakwood Photo Station #10 Photo Station #10

61 Oakwood Photo Station #11 Photo Station #11
100 Oakwood Demolition Photos January 2010

110 Oakwood Construction Photos February 2010 to June 2010
112 Oakwood Construction Photos July 2010 to December 2010
114 Oakwood Construction Photos January 2011 to March 2011
116 Oakwood Construction Photos April 2011 to June 2011
118 Oakwood Construction Photos June 2011 to August 2011

120 Oakwood Construction Photos August 2011 to October 2011
122 Oakwood Construction Photos October 2011 to December 2011
124 Oakwood Construction Photos December 2011 to December 2011
126Oakwood Construction PhotosJanuary 2012 to February 2012
128Oakwood Construction PhotosFebruary 2012 to February 2012
130Oakwood Construction PhotosFebruary 2012 to March 2012
132Oakwood Construction PhotosApril 2012 to July 2012
134Oakwood Construction PhotosJuly 2012 to August 2012
136Oakwood Construction PhotosAugust 2012 to October 2012
138Oakwood Construction PhotosOctober 2012 to November 2012
140Oakwood Construction PhotosNovember 2012 to December 2012
142Oakwood Construction PhotosDecember 2012 to January 2013
144Oakwood Construction PhotosJanuary 2013 to February 2013
146Oakwood Construction PhotosFebruary 2013
148Oakwood Construction PhotosMarch 2013 to September 2013
150Oakwood Construction PhotosOctober 2013
152Oakwood Construction PhotosOctober to December 2013
154Oakwood Construction PhotosDecember 2013 to March 2014
156Oakwood Construction PhotosApril 2014 to December 2016
 
701In Memory of Suzanne SkeelDecember 2014
801 Topping Off Day June 14, 2011
901 Oakwood Miscellaneous Photos Miscellaneous Photos

904 Quan Yin Statue Photos Quan Yin Statue Photos

907 Chilin (Kirin) Statue Photos Chilin (Kirin) Statue Photos

Construction Photos (continued)  
Back to Previous Construction Photos from Jul 2010 to Dec 2010
114


January 5, 2011
Front Entry
(looking SSE)
Dining Room From Living Room
toward second level Mezzanine
(looking South)


Looking South along Reflecting
Ponds and Cistern 
It looks like
an elevated train track
but it is the forming
for 4 critical concrete beams
A view of the building front
as it takes shape
(looking SW)

roofing system being formed forming

Looking South to
Media Room North wall
Looking SouthEast
towards Studio
Looking SouthEast toward
Media Room West wall
skylight forming


Looking at NorthEast
face of Studio
Looking South
towards Studio
Looking East  from Living Room
toward Sun Room
the Quan Yin Statue is
in protective plywood box
pouring concretea lot of bracing and forming
East face of residence prior
to Moon Gate construction
Looking South
towards Studio
Looking South from within Studio
toward Front Entrance.
Note the multi-angular column
to left at Front Entry
Looking through threshold
of Front door
Looking West
through Living Room
This column near Kitchen
connect four beams
(all beams not in
alignment by design)
East face of residence
(prior to Moon Gate construction)
From South side of
Living Room looking NorthWest
at West Patio
(also Reflecting Pond / Cistern) 
Looking at (fixed glass)
opening in West
wall at Master Vanity


Studio multi-angular
beam-column being formed
Forming beam along
South wall of Sun Room
Lots of beams
across Living Room 
What we refer to as
"The Crows Nest"
Looking West from center
of Master Bedroom. This will be enclosed in curtain wall glazing
Looking East from center
of Master Bedroom


More steel added to
Studio multi-angular
beam-column
Notch in top of Kitchen
North wall
for HVAC penetration
NorthWest wall of Studio
to be filled with glass block


A Live Oak tree closely
watching its new
concrete neighbor rising
Forming the high trough for the waterfall behind the large
Quan Yin statue in
East portion of Sun Room
A rare view from a crane / lift
at the North East corner of Sun Room (Note: the plywood box is protecting the Quan Yin statue)
2011-02-11
The steel "tee" framing
elements arrive for
glass block windows
A view from the lift
looking WSW toward
Mezzanine and
(future) Upper Loft
A view from the lift 
looking WNW toward
Dining Room & Media Room


From this birdseye view
one can see the Mezzanine
and the Study below it
Formwork for the wide beam
along the SE face of the Studio. Notice how close another
Live Oak tree is to the structure
Looking WSW over Studio
toward all the Live Oak
trees beyond. 
We think the Live Oaks are spectacular and to see them in person even more so.
A very deep beam over the
roll-up door to the Studio.  
Also, rough electrical now
being installed.
Looking SW toward the high framing for the Living Room. 
More Live Oaks keeping an
eye on our progress.
Krips Project Foreman Virgil W
taking notes and calculating requirements for the next concrete pour... and there have been many.
Note: The upper corner of
protective box for Quan Yin statue can be seen at about 27' high
after forms removed
Krips Construction crew assessing
the formwork for the complicated multi-angular / column/beam
over Studio's East facade
Krips Project Foreman Virgil W checking the alignment of steel
mounting tracks for
roll-up doors at Entry Foyer
Looking South across
Living Room toward Mezzanine
and Study below. This view in future will be surrounded by curtainwall glazing

Here we see Virgil again, installing more steel angle for roll-up doors. We see Virgil everywhere, he is a very busy Project Foreman Formwork being readied for a concrete pour at multi-angular column at Studio front. Here we see Krips
Project Manager Kevin M
and Banaszak
Concrete using vibration to settle concrete pour for multi-angular column.
The excitement of Peter's
design is really taking shape.
steel tees being installeda view towards Oakwood

The east face of the
Sun Room (Conserviary)
high beams now in place
The multi-angular column
at Studio front
with forms removed
Inside the Studio looking East toward cantilevered beam
that will support Hambro joists


Beams, Columns,
Trees, Light, Shadow
High beam above
Quan Yin Statue
being formed
Soaring steel


more high beam block work taking shape thumbs up!
2011-02-24 ----- -----


----- ----- -----


2011-02-25 beams and columns 2011-02-28
2011-03-03
The Chilin arrives
and is being uncrated
 close up of Chilin profile Peter being interviewed by
Channel 10 WPLG-TV's
Roger Lohse for the 6:00 news
Thanks Roger!
The concrete platform with
accurate chalk lines for
locating the Chilin statue base 
the base is moved
into position
Kiwi (a Border Terrier)
Peter's sister's dog
showing us how the
Chilin should sit
the Chilin is now
lowered into position
Virgil is right on the spot
with the leaf blower to keep everything clean and prepared
Kevin steps in to do some fine grinding so that the base sets as closely and evenly as possible
the view coming down the drive, one will see the Chilin but not until coming around the bend the Chilin in place but the horns have not been installed  Kevin and Peter's brother-in-law Joseph placing the horns into pockets with sand filler to keep in place.


now finished Peter and Virgil take a moment out of a very busy days to pose for a photo Roger Lohse and WPLG camera crew as well as Vanessa Ruiz
from WSVN-7 preparing for
live remote broadcast from site
for 6:00PM news
As the sun sets and the light
fades spot lights are used for
the TV broadcast.  
Roger did a great job
telling our story.  



broadcast finished and the camera crew packing up and on the
the next big story.
Thank you WSVN - Ch 7
and Vaness Ruiz
Thank You Roger Lohse
and WPLG Ch 10
There is a lot more to come so please keep in touch.


looking the the multi-angular column/beam at the Studio looking up toward the
NorthWest high ceiling of
Living Room where
glass block panels
will be installed
bracing and formwork 
outside Bedroom #2 from an elevated vantage
point looking at EastSouthEast corner of Sun Room
from elevated vantage
point looking toward slab
formwork for Bath #3

Crane operator getting
ready to raise 24" deep steel support beam between
Living Room and  Sun Room
securing strapping prior to
raising steel beam
beam starting to lift up
beam being raised
up to height
construction crew guiding
beam into position
Construction Project  Manager Kevin M making certain
beam is set right


Project Foreman Virgil W
doing a little high wire (+30 ft))
to removed lift straps
another view of Studio front view of main Covered  Entry
Hambro (tm) joists
prior to installation
Hambro (tm) joists hanging on beams but not yet positioned joists being laid out
with "roll bars"
joists in place and plywood base being installed joists, rollbars and
plywood over MBR
more joists being installed
Construction crewman Eugenio
installing plywood base
close-up of Hambro
joists and roll bars
Project Foreman Virgil W Sr
with crewman Virgil W Jr
installing support angles
for Hambro
A stack of mesh ready to be installed on roof decks Hambro(tm) joists and plywood forming for roof decks Live Oaks are close
enough to touch
plywood forming for roof deck This Live Oak trunk could not get any closer.. less than 2" another view of a Live Oak
and how close it is
it's not really a fireplace,
its a shaft for water to
flow down from upper roof
construction crew placing
another support angle
pointing to a stiffener  weld
for the large steel beam
over Living Room / Sun Room


Peter inspecting progress beams forming a trough
for waterfall
behind Quan Yin statue
a view down to Living Room
from high ceiling
approx 28' above


Hambro(tm) Joists on 45 deg
angle over Studio
a view of steel beam over
Living Room / Sun room
looking north
the Live Oaks support
other planst anf flowers


a view east along the
north wall of Studio
a Hambro(tm) joist seated on a ledger angle from below a Hambro(tm) joist seated on
a concrete beam
a Hambro(tm) joist seated
on  the corner of
two concrete beams
Hambro(tm) joists seated
on concrete beam along
north wall of Studio
"the thinker"

back to top
Construction Photos continued >  